Inland Rail’s 60-hour track possession a success with Broadford bridge removed

Hamilton St bridge, Broadford, Victoria has been demolished, to be replaced with an elevated bridge to accommodate double-stacked freight trains.

Inland Rail has completed all scheduled works during a 60-hour track possession on the Beveridge to Albury section of the project, including the demolition of the Hamilton St bridge at Broadford.

Hold tight - we’re checking permissions before loading more content